Policies and Procedures

Site Conditions
SCL Site Conditions for Corporate Offices
SCL Site Conditions for Power Stations
Site Conditions - Mica Creek Power Station
Site Conditions - Swanbank Power Station
Site Rules - Tarong Power Station
Site Work Conditions - Tarong North Power Station
Site Work Conditions - Tarong Power Station
Site Work Conditions and Rules - Mining Operations
Wivenhoe Small Hydro Site Conditions

Terms of Business

Stanwell Terms of Business - Goods and Services

Corporate Policies
Environmental Policy
Health and Safety Policy
Risk Management Policy
Workers Rehabilitation Policy

OH&S Control Guides and Templates
Contractor Work Method Statement Template
Mobile Plant & Equipment - Access to Site Checklist
Pre-attendance Registration


Environmental Standards and Procedures - Stanwell Power Station, and Barron Gorge and Kareeya hydros
Barron Gorge-Kuranda Weir Environmental Management Plan
Infrastructure Maintenance Permit WTMA06020
Kareeya-Koombooloomba Environmental Management Plan

Environmental Standards and Procedures - Swanbank E and Mica Creek power stations
Table of Contents - Environmental Management System Procedures
Environmental Issue Identification
Developing Environmental Planning
Environmental Audit, Review and Performance Evaluation
Environmental Communication and Training Process
Environmental Incident Management
Environmental Legal Compliance
Environmental Monitoring and Measurement
Environmental Management System Manual

OH&S Standards, Procedures and Forms - Stanwell Power Station, and Barron Gorge and Kareeya hydros
Allowing non SCL owned mobile plant or equip perform work on SCL owned or op sites Corp Proc
Animal and Insect Hazards Corporate Standard
Asbestos Management Corporate Standard
Authority to Work Corporate Procedure
Authority to Work Corporate Standard
Barricading and Restricted Access Corporate Standard
Barron Gorge Site Health and Safety Plan
Biological Water Hazards Corporate Standard
Clean up of Body Fluids and Substance Spills Corporate Standard
Confined Spaces Corporate Standard - ATW
Crane and Hoist Use Corporate Standard
Dangerous Goods Management Corporate Standard
Earthmoving Equipment Corporate Standard
Electric and Magnetic Radiation (EMR) Corporate Standard
Electrical Safety Corporate Standard - ATW
Electrical Testing to Prove De-energised Requirements Corporate Procedure - ATW
Elevating Work Platforms - EWPs Corporate Standard
Excavation and Digging Corporate Standard - ATW
Falls and Falling Objects Corporate Standard - ATW
Fault Finding on Low Voltage Electrical Equipment Corporate Procedure - ATW
First Aid Corporate Standard
Fitness for Work Corporate Standard
Forklifts Corporate Standard
Hazard and Incident Reporting Corporate Standard
Hazardous Areas Corporate Standard
Hazardous Substance Management Corporate Standard
Health Surveillance Corporate Standard
Hot Work Corporate Standard - ATW
HSE Hazard Management Corporate Standard - ATW
Immunisation Corporate Standard
Kareeya and Koombooloomba Site Health and Safety Plan
Lead Management Corporate Standard
Lifting Equipment Corporate Standard
Lone Work of Work in Remote Locations Corporate Standard
Maintaining Electrical Tools and Protective Devices and Clothing Corporate Procedure - ATW
Manual Handling Corporate Standard
Motor Vehicle Safety and Usage Corporate Standard
Occupational Noise Management Corporate Standard
Office Safety Corporate Standard
Plant Isolation Corporate Procedure
Plant Isolation Corporate Standard
Portable Ladders Corporate Standard
Pressure Hoses Corporate Standard
Radiation Safety Corporate Standard - ATW
Safe Handling and Disposal of Sharps Corporate Standard
Safety Signs Corporate Standard
Scaffolding Corporate Standard
Scafftag Procedure
Solar Ultraviolet UV Radiation Corporate Standard
Synthetic Mineral Fibres (SMFs) Corporate Standard
Welding Corporate Standard
Workers Rehabilitation and Compensation Corporate Procedure
Working in Hot and Cold Environments Corporate Standard
Working on Bodies of Water Corporate Standard

OH&S Standards, Procedures and Forms - Swanbank E and Mica Creek power stations
Airborne Dust Management
Asbestos Management Plan
Behavioural Observations
Conducting Behavioural Observations
Conducting Workplace Inspections
Crane Permit
Electric Shock Treatment and Reporting
Electrical Safety Mangement
Fair and Just Cause
Guidelines for Health, Safety and Environment Plans
Hazardous Airborne Fibre Management
Hazardous Substances and Regulated Waste
Health and Safety Manual
High Voltage
Identifying and Locating Services
Incident Injury Hazard Report
Incident Management
Injury Procedures
Inspection and Testing of Electrical Equipment
Lead Paint
Life Savers
Mica Creek Gas Safety Management Plan
Minimum Health and Safety Standards for Critical Rsks
Noise Management
Overhead Works
PCB Filled Capacitors
Petroleum and Gas Safety Management
Selection, Maintenance and Use of Electrical Safety Equipment and PPE
Toolbox Talk Meeting Record
Working in Heat
Workplace Inspection Form

OH&S Standards, Procedures and Forms - Tarong and Tarong North power stations
Authorisation to Perform Work from a Workbox
Barricades
Confined Space Entry Authorisation
Elevated Work Platforms
Excavation and Digging
Fall Injury Prevention System
Fitness for Work - Alcohol and Other Drugs
Fitness for Work - Fatigue Management
Fixed Platforms
Hazardous Substances and Dangerous Goods Management
Health, Safety and Environment (HSE) Injury and Illness Report Form
Health, Safety, Environment and Quality (HSEQ) Incident Investigation Report
Hot Work and Ignition Sources in Hazardous Areas
Hot Work and Ignition Sources in Hazardous Areas Authorisation
Hot Work and Ignition Sources in Non-Hazardous Areas Authorisation
Hot Work and Ignition Sources in Hazardous Areas Sign On and Off Sheet
Hot Work Precautions Checklist - Hazardous Areas
Hot Work Precautions Checklist - Non-Hazardous Areas
HSE Plan
HSE Star Card
HSEQ Incident Report
ICAM Analysis Form
Incident Reporting and Management
Induction Application Form
Job Safety and Environmental Analysis Procedure
Job Safety and Environmenal Analysis Form
Land Clearance and Disturbance Application Form
Lone Worker/Remote Worker Communication Plan
Lone Work/Work in Remote Locations
Managing Vehicle and Mobile Equipment Safety at Operating Sites
Mobile Plant and Equipment - Access to Site Checklist
Oversize Vehicle Access to Site
Personal Protective Equipment (PPE)
Respiratory Hazards and Guidelines for Respiratory Protective Equipment
Safe Use of Forklifts
Safe Use of Grinders
Safe Woking in a Confined Space
Safe Working on Roofs
Safe Working with Heights
Safety Behaviour Audit
Scaffolding
Site Crane and Hoist Familiarisation and Authorisation
Site EWP (excludes Razor Deck) Familiarisation and Authorisation
Site Forklift Familiarisation and Authorisation
Site Razor Deck Familiarisation and Authorisation
Specific Traffic Management Plan
Synthetic Mineral Fibres
Underwater Diving Work
Unprotected Edge Authorisation
Unprotected Edge Risk Control
Vehicle Access Form
Working on Water
Working with Ladders

Permit to Work (PTW) Procedures - Swanbank E and Mica Creek power stations
Confined Space
Excavation and Digging
Hot Work
Live Plant No PTW
PTW Code of Practice
PTW Definitions
PTW Initialling and Issuing
PTW Manual
PTW Operations
PTW Plant
PTW Procedures and Guidelines
PTW Reference Documentation
PTW Routine and Switching Sheets
Risk Assessment and JSA
Sanction to Test Procedures
Test Designated Plant Under Blanket Permit
Work at Heights

Other
Corporate Entertainment and Hospitality Policy