High priority water allocations such as Tarong Power Station aren’t affected by the Boondooma Dam cut-off rule.
Water used at Tarong Power Station is dependent on unit capacity and load demand in the energy market.
The majority of water that is used at the power station is to cool the excess steam from the steam turbines.